CE marked · ISO 9001:2015 · 18-month warranty

· products · By

Choosing a Single Screw Granulator for Your Material

A six-question decision tree for single screw granulators: formulation, mixing, changeover frequency, throughput, feed preparation and budget.

TENGLONG TL-SJ single screw granulator — product photograph from the TL-SJ range

Summary: A single screw granulator is the right machine for a narrow band of jobs, and the wrong machine for a narrow band of others. This article is a decision tree rather than a comparison: six questions asked in order, each of which either keeps you on a single screw or sends you to a different platform. The questions are about formulation and mixing demand, colour changeover frequency, throughput, the feed preparation already on site, and the budget and schedule behind the order. Each answer cites the published figure that settles it. The tree ends in a verdict: the TL-SJ model that fits, the options worth pricing, and the point at which the correct answer is a twin screw, a double-stage line or a die-face water ring cutter instead.

TENGLONG TL-SJ single screw granulator — product photograph from the TL-SJ range
TENGLONG TL-SJ single screw granulator: one of the configurations in the published TL-SJ range.

The tree as six questions, asked in this order

The order matters, because each question eliminates platforms rather than selecting one. Formulation comes first, since a screw cannot be chosen before you know whether the material needs mixing or only melting. Changeover frequency comes second, because it decides whether the capital saving survives the running cost. Throughput comes third, because it sets the model inside the family. Feed preparation comes fourth, because it can disqualify the whole family. Budget and schedule come last, because they choose between the answers rather than the machines.

Two published pages carry the reference data used along the way: granulator selection by material for the polymer questions and granulator types compared for the platform questions. Where the economics of a twin screw line matter, the figures sit on single screw versus twin screw rather than being repeated here.

How to use the tree

Answer the questions in order and stop at the first one that sends you elsewhere. The most common mistake is to start at question three or four, because output and price are the numbers everybody writes down first, and then to defend a machine the material never allows.

Question one: one or two known polymers, or a formulation that needs mixing?

This is the branch that ends most enquiries. A single screw melts and homogenises; it does not disperse. The published rule is precise: filler above 15%, glass fibre, flame retardant, or colour that must disperse below 20 µm belong to a twin screw.

  • One or two known, clean polymers — PP, PE, ABS, PS, HDPE flake or regrind — and the answer stays on the TL-SJ single screw granulator family, which is published for clean PP, PE and ABS regrind at 150 to 700 kg/h.
  • Filled or reinforced — above 15% filler, or glass fibre at any level — and the branch turns to the TL-TS twin screw granulating line, where gravimetric dosing and a 40:1 L/D co-rotating pair are the reason premium dispersion is possible.
  • Colour that must not show specks — below 20 µm — and a static mixer only carries a single screw to about 10 to 20% pigment; above 30% the dispersion is not good enough for thin film.
  • Masterbatch — that is a compounding job, and the TL-MB masterbatch granulator is the platform to quote.

If your material is a clean polymer with no filler, stay here. Everything below assumes that answer.

Question two: how often does the material change, and how dirty is it?

Changeover frequency. A single screw has to be purged; a twin screw with self-wiping geometry does not. The published figures are 2 to 3 hours for a colour change on a single screw against 40 to 60 minutes on a twin screw. That is not a rounding difference in a plant running hourly colours — it is the whole case for the twin screw, and it is why the capital saving of US$12,500 to 46,000 against a twin screw that starts at US$38,000 is spent again on a machine that runs four colours a day.

Contamination. The published feed condition for a single screw is material smaller than 30 mm, free of sand, metal and paper, filtered through a 40 to 80 mesh hydraulic double-piston screen changer. That is a definition of a washed, sorted feed. Post-consumer bales that have not been washed and sorted do not meet it, and the answer is upstream — the washing and size-reduction routes — or a different platform that filters twice, the TL-2S two stage granulating line at 300 to 1,200 kg/h with 60 to 100 mesh filtration.

Why contamination is asked before output

Because contamination is the one answer that can disqualify the family entirely. A material that is too dirty does not need a bigger or cheaper screw; it needs a different machine, and a quotation written before the washing route is settled will be reopened.

Question three: what throughput, and which model inside the family?

Inside the single screw family the choice is mechanical and published: four models, four bands, four motor ratings. The TL-SJ-90 runs 150 to 200 kg/h on 55 kW, the TL-SJ-100 runs 220 to 300 kg/h on 75 kW, the TL-SJ-120 runs 350 to 450 kg/h on 110 kW, and the TL-SJ-150 runs 550 to 700 kg/h on 160 kW. Where the requirement falls in a gap, take the next screw up and run it below its band.

The upper limit is where this question can end the single screw entirely. The family tops out at 700 kg/h; above that, the twin screw platform covers 300 to 1,500 kg/h and the double-stage line covers 300 to 1,200 kg/h. If your plant needs 1,200 kg/h of one material in one line, that is the moment to stop reading this tree and read the twin screw figures instead.

The lower limit deserves a question too. Below about 150 kg/h, the labour line in a cost model starts to dominate the machine price, and a granulator may not be the right equipment at all — for very small volumes a TL-PM plastic pellet mill is worth comparing. The selection logic by output is set out in how to choose a plastic granulator.

Once the band is settled, the model follows from it, and the options follow from the material: a bimetallic screw and barrel for 30%+ glass-filled regrind, a melt pump for ±0.5% output stability, and a die-face water ring cutter instead of the strand bath.

Question four: is the feed preparation already on site?

This branch is about what you already own, and it is most often skipped. A single screw granulator melts and pelletizes; it does not size-reduce, wash or sort. If your material arrives as film, bales or lumps, the upstream machines decide whether the line runs at all.

  • Film or light fibre — it needs densifying before a single screw can drag it forward, and the TL-FL film granulating line with a cutter compactor is the published route.
  • Rigid flake, already under 30 mm — this is the best case for a single screw, and a force feeder is enough on top of a granulator.
  • Post-consumer bales — washing and sorting come first, and only then the granulator.
  • Nothing on site yet — then the plant question is a turnkey question, covering layout, power and handling as one scope.

The question inside the question

Ask whether the plant has a crusher and shredder ahead of the granulator, and whether the flake arriving at the hopper is genuinely under 30 mm. That measurement decides whether the feed is a granulator feed at all.

The verdict, and the two places a single screw stops being the answer

Run the tree. If the answers are one or two clean polymers, an infrequent colour change, a throughput inside 150 to 700 kg/h and feed preparation that already delivers material under 30 mm free of sand, metal and paper, then the answer is a TL-SJ, and the only remaining question is which model and which options: the melt pump for ±0.5% output stability, the bimetallic screw and barrel for 30%+ glass-filled regrind, and the die-face water ring cutter instead of the strand bath when floor space is tight.

Where the tree sends you to a twin screw. Formulation first: filler above 15%, glass fibre, flame retardant, or colour that has to disperse below 20 µm. Then frequency: hourly colour changes, where the published 2 to 3 hour changeover against 40 to 60 minutes decides it. Then throughput above 700 kg/h in one line.

Where the tree sends you to a double-stage line or to the water ring. Dirty post-consumer feed that has to be filtered twice belongs to the double-stage line at 60 to 100 mesh, not to a single screw with a 40 mesh pack. And when the line is long but the floor is short — a strand bath needs 8 to 10 m of running length and a die-face water ring cutter saves about 40% of that — the right answer is the TL-WR water ring pelletizer or the water ring option on the single screw itself, with a rounder pellet as the trade.

The commercial conditions are the same on every branch: lead time 25 to 30 days, warranty 18 months from commissioning with 3-year spare-parts availability, payment 30% T/T deposit with the balance before shipment and a letter of credit at sight above US$50,000, and FOB Qingdao, CIF or DAP. The price band of US$12,500 to 46,000 is indicative for the base configuration and the firm figure follows the material test, described on how every line is factory tested.

The one-sentence version

A single screw granulator is right when the material is a clean, unfilled polymer that arrives prepared, changes rarely, and needs less than 700 kg/h in one line — and wrong the moment any one of those conditions fails.

The decision tree in one table: each question, the answer that keeps you on a single screw, the answer that sends you elsewhere, and the published figure behind the branch.
Question Stays on a single screw Goes elsewhere The figure that decides it
Does the recipe need mixing or only melting? One or two clean polymers: PP, PE, ABS, PS, HDPE Filler above 15%, glass fibre, flame retardant, colour below 20 µm Single screw published for clean PP, PE and ABS regrind at 150 to 700 kg/h
How often does the material change? Infrequent colour changes Hourly colours, where purge time is the dominant cost 2 to 3 hours changeover on a single screw against 40 to 60 minutes on a twin screw
How clean is the feed? Washed, sorted, under 30 mm, free of sand, metal and paper Unwashed post-consumer bales 40 to 80 mesh screen changer on the single screw; 60 to 100 mesh on the double-stage line
What throughput is needed in one line? 150 to 700 kg/h on one of four models Above 700 kg/h in a single line TL-SJ-90 to TL-SJ-150 bands; twin screw covers 300 to 1,500 kg/h
Is the feed prepared upstream? Rigid flake already under 30 mm Film that needs compaction, bales that need washing Force feeder on prepared flake; cutter compactor on film; washing line on bales
How much floor length is available? 8 to 10 m for the strand bath and the air knife Short floor with the same output Die-face water ring cutting saves about 40% of the strand footprint
What is the budget and schedule? US$12,500 to 46,000 FOB Qingdao, 25 to 30 days A budget that only fits a twin screw platform or a full plant Twin screw starts at US$38,000; payment 30% deposit and 70% before shipment

Frequently asked questions

Q1: Is a single screw granulator enough for my clean PP and PE regrind?

Usually yes. The published TL-SJ platform handles clean PP, PE and ABS regrind at 150 to 700 kg/h, with a 30:1 nitrided screw and a double-piston screen changer with 40 to 80 mesh packs. Four conditions must hold: one or two known clean polymers with no filler, feed smaller than 30 mm and free of sand, metal and paper, infrequent colour changes, and throughput inside the four published model bands.

Q2: When should I move from a single screw to a twin screw granulator?

Three triggers, in this order of importance. First, formulation: filler above 15%, glass fibre, flame retardant, or colour that must disperse below 20 µm, because a single screw melts and does not disperse. Second, frequency: hourly colour changes, where the published 2 to 3 hour changeover against 40 to 60 minutes on a twin screw is the whole argument. Third, output above 700 kg/h in one line.

Q3: How do I know whether my feed is clean enough for a single screw?

Read the published feed condition for the platform: material smaller than 30 mm, free of sand, metal and paper, entering through a force feeder or gravity hopper with a metal detector, filtered through a 40 to 80 mesh pack. If the material has not been washed and sorted, it does not meet that condition, and the fix is a washing and size-reduction route upstream.

Q4: How many colour changes per day can a single screw granulator handle?

The published changeover figures decide it rather than a hard number: 2 to 3 hours on a single screw against 40 to 60 minutes on a twin screw with self-wiping geometry. That means a handful of long production runs a day rather than hourly colours. Recipe storage and one-touch start on the Siemens S7-1200 PLC cut the setting side of a change, but they do not shorten the purge.

Q5: Should I buy a water ring cutter instead of the strand bath on a single screw line?

It depends on the floor, not on the extruder. The strand route needs 8 to 10 m of running length for the 4 m bath, the air knife and the cutter, and it gives cubic pellets that are easy to inspect. Die-face water ring cutting saves about 40% of that length, at the cost of slightly rounder pellets and a dewatering step.

Engineer’s note

Most of the mis-selections I see were decided before anyone opened a machine catalogue. A formulation with filler, or a schedule with four colours a day, decides the platform immediately, and no price advantage changes it. The engineering work then starts on the screw: our 38CrMoAlA screws are nitrided in-house to a 0.5–0.7 mm case at HV 900–1000, runout is held to 0.03 mm, and barrel, screw, gearbox and frame are aligned to 0.05 mm before the four-hour test run.

Engineering note: the numbers on this page are our own published reference ranges for the machine family, not a specification guarantee for any individual unit. Final output, specific energy and pellet quality are set by the incoming material, its moisture and contamination level, and the screen pack fitted. We write the confirmed figures onto the quotation after a factory test run on your own material.

Who wrote this

Zhou Gong (周工) is a senior plastic machinery engineer at TENGLONG Plastic Machinery in Linyi, Shandong. The factory was registered as Linyi Hedong District Tenglong Plastic Machinery Factory on 7 June 2016 and grew out of a screw and barrel workshop, so his work is rooted in the parts that decide whether a granulator holds output: screw geometry, nitriding case depth, barrel alignment and melt filtration. He prepares the technical specification for customer quotations, reviews the four-hour factory test data before shipment, and runs commissioning support on site. Screws are nitrided in-house to a 0.5–0.7 mm case at HV 900–1000 and straightened to 0.03 mm runout over the full length; barrel, screw, gearbox and frame are aligned to 0.05 mm before the test run.

Figures quoted here are engineering reference ranges published on our own product pages, not guaranteed values for any specific machine. Real output, specific energy and pellet quality depend on the incoming material, its moisture and contamination level, and the screen pack fitted. Final values are written after a factory test run on the customer’s own material, and the PLC-logged test report ships with the machine. For a quotation that reflects your material, send the feed form, contamination level and target output and a configuration comes back within one working day.

Run the tree with us: send the polymer, the filler level, the contamination level, the colour change frequency and the target output, and we will return the platform, the model, the options and the numbers. Request the decision tree applied to your material — a reply comes back within one working day.

Related reading

العربيةAR