CE marked · ISO 9001:2015 · 18-month warranty

Process control

Quality is a test report, not a slogan

Every machine leaves the plant with a four-hour material run recorded on the PLC, a pellet size distribution, an insulation test and a photograph set. You receive the file with the shipping documents.

Manufacturing

From steel to shipping crate

  1. Incoming material

    Screw blanks carry a 38CrMoAlA mill certificate; gearboxes and motors are checked against the ordered brand and IP rating before acceptance.

  2. Machining

    Screws are turned, milled and ground on CNC, then nitrided to 0.5–0.7 mm and straightened to 0.03 mm runout over the full length.

  3. Assembly

    Barrel, screw, gearbox and frame are aligned to 0.05 mm; the coupling is checked with a dial gauge after torqueing.

  4. Wiring

    Panels are wired to IEC schematics with ferrules and numbered cores; every terminal is torque-checked and photographed.

  5. Test run

    24 hours no-load, then 4 hours on your material with output, melt pressure, melt temperature and kWh logged every minute.

  6. Pack

    Painted surfaces are waxed, shafts braced, electronics boxed separately and the whole unit sealed in a fumigation-free plywood crate.

Test report

What the test report contains

  • Actual output in kg/h, averaged over four hours
  • Specific energy in kWh per kg of pellets
  • Melt pressure and melt temperature at the die
  • Pellet size distribution: oversize, on-size, fines
  • Screen pack used and pressure rise per hour
  • Insulation resistance, earthing continuity, interlock test
  • Photographs of the wiring, nameplate and serial number

Components

Components you can verify

Part Brand / spec
Main motor Siemens Beide / WEG, IE3, IP55
Variable frequency drive ABB ACS380 / Danfoss FC51
PLC and HMI Siemens S7-1200 / S7-1500, 7–10 inch HMI
Gearbox Hardened helical, 20CrMnTi, service factor 1.8
Screw and barrel 38CrMoAlA nitrided; bimetallic optional
Electrical components Schneider / Siemens, CE marked
Pneumatics AirTAC / SMC

Service

After the machine lands

Installation and commissioning

Seven to ten days on site for a full line, three to five for a single machine. Travel and accommodation are covered by the buyer.

Operator training

Two days of classroom and hands-on training covering start-up, screen change, blade change and fault diagnosis.

Spare parts

Three-year availability, air freight within 72 hours for critical parts. A recommended wear-kit list ships with every machine.

Remote support

PLC remote access via 4G router on request, so most electrical faults are diagnosed without a site visit.

CE marking with a Declaration of Conformity, ISO 9001:2015 quality system, and material certificates for screws, barrels and gearboxes on request.

Next step

Want a sample test report?

We can send a complete report from a comparable machine, including the PLC trend and pellet size distribution.

العربيةAR